Thursday, May 21, 2009

New Home Project

Last year we almost put our house on the market in order to upgrade to a larger house (we even signed a contract for building the house, which we were able to get out of easily and without any penalties), but we were not comfortable with how much money the banks were willing to lend us, blah blah, blah. We still had the problem of outgrowing our home. Luckily our neighbor, Jarrod (Megan's daddy), finishes basements (and other home repair needs) for a living. He actually turned our loft into a third bedroom for Paige when I was pregnant with her. Anyway, we have hired him to finish our basement--YAY! When all is finished (hopefully in early July) we will have a fourth bedroom/office, a great room with entertainment center, a fourth bathroom, and a potential for a wet bar. Here are the before pictures (but after we emptied it of all of our "stuff").

This is taken from the top of the stairs on our main level
From the landing of the stairs down into the basement
Looking into the what will be the bedroom from it's entrance
In the bedroom looking towards it's entrance
Looking into the great room after coming down the stairs
Looking down into the great room, and that back wall will be able to have a wet bar at some point, but not this summer
The right part will be a utility room, and the left will be a bathroom
Different angle from the great room; the right part will be the built in entertainment center

So now Jarrod is framing (as we speak, actually), and we've had some plumbing done. As progress is made I will take more pictures and keep the blog updated (really, I will!).

No comments: